Main Distribution Panel MDP-01
EL-RIVERSIDE-MAIN-PANEL
Riverside Office
Electrical intake room
- Last checked
- 14 Oct 2026
- Due date
- 13 Nov 2026
Today's Overview
Monday, 19 October 2026
Asset register
Circuits, breaker banks and wiring runs with current condition, service dates and the latest inspection result.
Overview
5
Total assets
3
Operational
2
Need attention
2
Overdue checks
Main Distribution Panel MDP-01 EL-RIVERSIDE-MAIN-PANEL Riverside Office · Electrical intake room Last checked 14 Oct 2026 | Riverside Office Electrical intake room | 14 Oct 2026 | 13 Nov 2026 | No inspections yet | Operational |
Breaker Bank BB-12 EL-MAPLE-BREAKER-BANK Maple Court · Level 1 switch room Last checked 07 Oct 2026 | Maple Court Level 1 switch room | 07 Oct 2026 | 18 Oct 2026 | No inspections yet | Attention |
Lighting Circuit L3-C EL-HARBOUR-LIGHTING-CIRCUIT Harbour House · Third floor east wing Last checked 11 Oct 2026 | Harbour House Third floor east wing | 11 Oct 2026 | 10 Nov 2026 | No inspections yet | Operational |
Feeder Wiring Run FWR-09 EL-GREENFIELD-WIRING-RUN Greenfield School · Sports hall sub-board Last checked 01 Oct 2026 | Greenfield School Sports hall sub-board | 01 Oct 2026 | 14 Oct 2026 | Fail | Fault |
UPS Circuit UPS-04 EL-TECHSPACE-UPS-CIRCUIT TechSpace Ltd · Server room Last checked 17 Oct 2026 | TechSpace Ltd Server room | 17 Oct 2026 | 16 Nov 2026 | No inspections yet | Operational |
EL-RIVERSIDE-MAIN-PANEL
Riverside Office
Electrical intake room
EL-MAPLE-BREAKER-BANK
Maple Court
Level 1 switch room
EL-HARBOUR-LIGHTING-CIRCUIT
Harbour House
Third floor east wing
EL-GREENFIELD-WIRING-RUN
Greenfield School
Sports hall sub-board
EL-TECHSPACE-UPS-CIRCUIT
TechSpace Ltd
Server room